I just being informed now that tomorrow 29/05/2024 in my area there will be another electrical power off from 9:00 to 16:00!!!!
This means that battery power supply cannot handle 7 hours of power failure, so I need to program that the server shot down automatically before 9:00 to preserve it.
It need to be manually power on and this could be done at 19:00.
Sorry for the problems.
Thanks
Source
Actualités en direct des projets (non traduites)
ODLK1 - Electrical work 3
- Détails